| CONTINENTAL MINERALS CORPORATION : http://www.continentalminerals.com/ : Live Customized Report |
| Xietongmen Project Development |
Xietongmen Mineral Reserves at 0.15% copper cut-off |
|||||
Mineralized |
Category |
Tonnes |
Cu |
Au |
Ag |
Oxide |
Proven |
0.9 |
0.20 |
0.49 |
2.99 |
Supergene |
Proven |
17.5 |
0.65 |
0.42 |
3.35 |
Hypogene |
Proven |
152.3 |
0.43 |
0.66 |
4.22 |
|
Total |
182.1 |
0.45 |
0.62 |
4.04 |
A Technical Report on the August 2007 Feasibility Study is filed on SEDAR at www.sedar.com. The authors of the report are Graham Holmes, P.Eng., Aker Kvaerner, Patrice Live, Eng., BBA Inc., and Lawrence Melis, P.Eng., Melis Engineering., who are independent Qualified Persons.
Production Rate |
40,000 tonnes per day |
|
Material Moved |
480.1 million tonnes |
|
Strip Ratio |
1.64:1 |
|
Annual Throughput |
13.2 million tonnes |
|
Recoveries |
Supergene |
Hypogene |
88.4% ± 1.9% |
92.1% ± 2.3% |
|
65.1% ± 4.8% |
59.7% ± 6.4% |
|
75.8% ± 4.2% |
77.6% ± 5.1% |
|
Life of Mine Metal Production |
|
|
1.6 billion pounds |
||
2.3 million ounces |
||
24 million ounces |
||
Mine Life |
14 years |
|